Custom homes built on your own lot in Greater Houston

Between owning a piece of land and living in a house on it there is a long list of things nobody mentions when you buy the lot: surveys, flood elevations, utilities, soil, permits, clearing, a foundation designed for that ground. We take the whole list, from the first look at the lot to the day you get the keys, under one contract and with one point of contact.

  • A lot evaluation before you commit to a design, or to the land
  • Site preparation, foundation, framing, roofing and finishes managed by one team
  • Infill lots, acreage and tear-down rebuilds
Aerial view of a city lot with the foundation trenched and the crew on site

Who this is for

An infill lot in the city

A vacant or cleared lot in an established Houston neighborhood. Setbacks, deed restrictions, utility taps and a tight site with neighbors on both sides shape what can be built and how the work is staged.

Acreage outside the city

Land in the counties around Houston, or elsewhere in Texas. There may be no city water or sewer, so a well and a septic system, a long driveway and power brought in from the road become part of the project.

A tear-down and rebuild

You like the address but not the house. The old structure comes down, the lot is prepared again, and a new home goes up on the same ground. See land clearing and demolition.

What we look at on a lot before design starts

The lot decides more of the budget than most first-time builders expect. Two lots at the same price can be far apart in what it costs to make them buildable, and it is better to know that before a plan is drawn, or before the land is bought. If you are still choosing between lots, we can look at the ones you are considering so the land cost and the site cost are weighed together.

Survey, setbacks and deed restrictions

The survey shows the true boundaries, easements and building lines. Deed restrictions and HOA rules can limit height, size, materials and where a garage may face. Together they define the box the house has to fit in.

Flood zone and elevation

Whether the lot is in a mapped floodplain, and how high the finished floor has to be, affects the foundation, the amount of fill, the permits and the cost of flood insurance for as long as you own the house.

Utilities: city services, or well and septic

Water, sewer, power and gas may be at the street, or a long way from it. Where there is no sewer, the soil and the lot size decide what kind of septic system can be permitted and where it and a well can go.

Soil and the foundation it calls for

Much of this region is expansive clay. A soil report tells the engineer how the ground behaves, and the foundation is designed for that lot, not copied from another one.

Access, trees and drainage

How trucks reach the pad, which trees you want to keep, and how water crosses the lot now. These decide where the house sits and how the site is graded.

What you get from the review

A plain account of what the lot will need before a house can go on it, and site preparation, utilities and the foundation priced as their own lines, separate from the house.

From lot to keys: the stages

The work on site runs in a fixed order, and each stage is inspected before the next one covers it. Because one team runs all of them, nothing waits for a different company to show up.

  • Site preparation. Clearing, demolition if there is an old structure, rough grading and a compacted pad. See land clearing and site preparation.
  • Foundation. Forms, beams, plumbing rough-in, vapor barrier, steel and the pour, built to the engineer’s design. See concrete.
  • Framing. Walls, floors and the roof structure, checked against the plans and engineering. See framing.
  • Dry-in and roofing. Sheathing, weather barrier, windows, roof decking and roofing, so the inside stays dry. See roofing.
  • Systems. Plumbing, electrical, and heating and air conditioning, each installed by a licensed contractor in that trade under our contract.
  • Finishes. Insulation, drywall, cabinets, flooring, tile, trim, paint and fixtures.
  • Final inspections and keys. Final inspections, a walkthrough with you, and the punch list closed out.

The same lot-to-house sequence on our job sites

Plans: yours, ours or an architect’s

You do not need finished plans to start the conversation. If you already have a set from an architect or a designer, we review it against the lot and the budget and build from it. If you have a plan you like but it was not drawn for your land, it usually needs adjusting for the setbacks, the elevation and the way the lot faces. If you have nothing on paper yet, we can connect you with licensed design professionals and take part while the plan is drawn, so that what gets designed can be built for the number you have in mind.

Either way, the structural and foundation design is done by a licensed engineer, and the plans are what the permit is issued on and what we are held to on site.

Permits and approvals depend on where the lot is

A lot inside a city such as Houston follows that city’s building permit and inspection process. In unincorporated county areas the path is different, and often involves the county for driveway, floodplain and septic approvals and a utility district for water and sewer taps. Subdivisions add their own architectural review. We map the approvals for your lot before design is finished and manage them from submittal to final inspection.

How we handle permits

Paying for a build on your land

Many owners pay for a custom build with a construction loan. In general terms, the lender approves the plans and the budget, the money is released in stages called draws as the work reaches agreed milestones, and the lender usually inspects before each draw. When the house is finished the construction loan is paid off or converted to a regular mortgage. Land you already own can count toward what the lender requires from you.

This is a description of how these loans commonly work, not financial advice; your lender sets the actual terms. What we provide is what lenders ask a builder for first: a written budget by category and a schedule.

What drives cost and schedule

A price per square foot hides most of what matters on a build-on-your-lot project, so we do not quote one. The house and the site are priced separately, from the plans and the lot.

What moves the price and the timeline

  • Site conditions: clearing, fill, drainage, driveway length and utility extensions
  • Foundation design for the soil and the flood elevation
  • Size of the house, roof complexity and ceiling heights
  • Exterior materials, windows and structural spans
  • Finish selections: cabinetry, flooring, tile, fixtures and lighting
  • Well and septic systems where there are no city services
  • Permit and review timelines, lender draw inspections and weather

After the lot evaluation and a first review of the plans we give you a written budget by category and a schedule.

Building on your lot: questions land owners ask

Still unsure? Ask us directly and we will answer in plain terms.

Can you look at a lot before I buy it?
Yes. We can review a lot you are considering and tell you what we see: restrictions, flood status, utilities, access and the site work it is likely to need. It is the cheapest point at which to find a problem.
Do I need plans before I contact you?
No. We work from an architect’s or designer’s plans if you have them, and can connect you with licensed design professionals if you do not. Starting with the lot and a budget is a good way to begin.
How long does it take to build a custom home?
It depends on the size and complexity of the house, how long design and permits take, and the weather. Design, engineering and approvals often take as long as people expect the building to take. We give you a schedule with the budget and update it as each stage is reached.
Do you build outside Houston city limits?
Yes. We build across Greater Houston, including the surrounding counties, and take on suitable projects elsewhere in Texas depending on the scope and the logistics. Tell us where the land is.
Can you build on a lot that needs a septic system and a well?
Yes. Septic systems are designed and permitted under state rules, usually through the county, and are installed by licensed installers; water wells are drilled by licensed drillers. We coordinate both and plan the house, the driveway and the drainage around them.
What will it cost to build on my lot?
We do not publish a price per square foot, because site conditions, the foundation and your finish choices change it too much. After a lot evaluation and a first design review we give you a written budget by category. See custom homes for how we approach the budget.

Own land, or about to?

Tell us where the lot is (the address or the county is enough) and what you would like to build. We will follow up to arrange a look at the land and talk through the next steps.

  • Written, itemized estimate
  • Permits and approvals handled for you
  • One point of contact from start to finish

Request an estimate

Tell us what you are planning. We follow up to schedule a site visit.

We use your details only to respond about your project. We do not sell or share them. See our privacy policy.